340
(4)
•
Writing to
Pr.19 Base frequency voltage
while inverter is running by setting
Pr.77 Parameter write
selection
="2".
•
Pr.296 Password lock level, Pr. 297 Password lock/unlock
, and output of Password locked error (LOCd).
•
Multi command of Mitsubishi inverter protocol (computer link communication), reading of
connected inverter type and capacity, special monitor "Cumulative power 2," and reading of fault
history "E.OPT".
•
Real time monitor of Modbus-RTU communication "Cumulative power 2," and reading of fault
history "E.OPT".
•
Output of option fault (E.OPT)
•
Communication parameters for FR-A7ND
(Pr.345 and Pr.346)
When parameter clear/all parameter clear is performed using DeviceNet communication or RS-485 communication,
communication parameters
(Pr.345 and Pr.346)
are not cleared.
The changes apply to the February 2009 production or later.
(5) Operating conditions for the SAFE signal and SAFE2 signal, and the 24VDC input option (FR-E7DS)
(available for the safety stop function models)
The inverters (safety stop function models) manufactured in September 2010 or later support the functions.
(Refer to page
31)
•
The operating conditions (E.6, E.7, and E.CPU) are added for the SAFE signal and SAFE2 signal,
which are used in the safety stop function (available for the safety stop function model).
(Refer to
page 31)
•
The 24VDC input option, FR-E7DS, can be used.
"68 (positive logic) and 168 (negative logic)" are added as the assignable EV signal settings for
Pr.190 to Pr.192
(Output terminal function selection)
.
"EV" flickers on the operation panel while the 24V external power is supplied.
Содержание FR-E710W-0.1K
Страница 49: ...40 MEMO ...
Страница 65: ...56 MEMO ...
Страница 288: ...288 MEMO ...
Страница 310: ...310 MEMO ...
Страница 334: ...334 MEMO ...
Страница 335: ...335 APPENDIX This chapter provides the APPENDIX of this product Always read the instructions before using the equipment ...
Страница 348: ...4 4 BCN C22005 679 MEMO BCN C22005 679 fm 4 ページ 2014年11月7日 金曜日 午前11時58分 ...