280
Numerics
15-speed selection (combination with three speeds RL, RM,
RH)(REX signal)
.............................................................84, 108
A
Acceleration time, deceleration time setting (Pr. 7, Pr. 8, Pr.
20, Pr. 21, Pr. 44, Pr. 45)
......................................................91
Acceleration/deceleration pattern (Pr. 29)
..............................94
Actual operation time
...............................................................123
Alarm output (LF signal)
..................................114, 179, 195, 225
Analog input fault (E.AIE)
........................................................253
Analog input selection(Pr. 73, Pr. 267)
.................................145
Applied motor (Pr. 71, Pr. 450)
.................................................98
Automatic restart after instantaneous power failure/flying start
(Pr. 30, Pr. 57, Pr. 58, Pr. 96, Pr. 162, Pr. 165, Pr. 298, Pr.
299, Pr. 611)
..........................................................................131
Avoid mechanical resonance points (frequency jumps) (Pr. 31
to Pr. 36)
..................................................................................79
B
Base frequency, voltage (Pr. 3, Pr. 19, Pr. 47)
Basic operation (factory setting)
...............................................49
Bias and gain of frequency setting voltage (current) (Pr. 125,
Pr. 126, Pr. 241, C2 (Pr. 902) to C7 (Pr. 905))
Brake transistor alarm detection (E.BE)
...............................251
Buzzer control (Pr. 990)
...........................................................238
C
Cables and wiring length
...........................................................16
Change the parameter setting value
.......................................51
Changing the control logic
.........................................................21
Checking the inverter and converter modules
Cleaning
.....................................................................................262
Command source switchover (turning on X67 makes Pr. 338
and Pr. 339 commands valid) (X67 signal)
Communication EEPROM write selection (Pr. 342)
Condition selection of function validity by second function
selection signal (RT signal)
.................................................111
Connection of a DC reactor (FR-HEL)
....................................32
Connection of a dedicated external brake resistor
(FR-ABR)
.................................................................................28
Connection of the brake unit (FR-BU2)
...................................30
Connection of the high power factor converter (FR-HC)
Connection of the power regeneration common converter
(FR-CV)
....................................................................................32
Connection to the PU connector
..............................................26
Control circuit terminal
...............................................................19
Converter Output Voltage
.......................................................123
Converter output voltage peak value
.....................................123
Cooling fan operation selection (Pr. 244)
.............................225
Cooling system types for inverter panel
....................................9
CPU fault (E.CPU)
....................................................................253
Cumulative energization time
.................................................123
Cumulative power
.....................................................................123
Current average value monitor signal (Pr. 555 to Pr. 557)
Current average value monitor signal (Y93 signal)
D
Daily and periodic inspection
..................................................261
Daily inspection
.........................................................................260
Dancer control (Pr. 44, Pr. 45, Pr. 128 to Pr. 134)
DC injection brake (Pr. 10 to Pr. 12)
.....................................104
Detection of output frequency
(SU, FU signal, Pr. 41 to Pr. 43)
........................................118
Display of the life of the inverter parts
(Pr. 255 to Pr. 259)
.......................................................226, 262
During PID control activated (PID signal)
During retry (Y64 signal)
.................................................114, 139
E
Earth (ground) fault detection at start (Pr. 249)
Easy operation mode setting (easy setting mode)
Electronic thermal O/L relay pre-alarm (TH)
Electronic thermal O/L relay pre-alarm (THP signal)
Electronic Thermal Relay Function Load Factor
Extended parameter display (Pr. 160)
.................................. 157
External thermal relay input (OH signal)
........................ 95, 108
External thermal relay operation (E.OHT)
...................... 95, 252
External/NET operation switchover (turning on X66 selects
NET operation) (X66 signal)
....................................... 108, 168
F
Fan alarm (FN)
................................................................. 225, 249
Fan fault output (FAN signal)
......................................... 114, 225
Fault or alarm indication
.................................................. 123, 241
Fault output (ALM signal)
................................................ 114, 117
Fault output 3 (power-off signal) (Y91 signal)
Faults history (E.---)
................................................................. 241
Fin overheat (E.FIN)
................................................................ 251
Forward rotation command (assigned to STF terminal (Pr.
178) only) (STF signal)
................................................ 108, 112
Free parameter (Pr. 888, Pr. 889)
......................................... 233
Frequency setting value
.................................................. 123, 128
Front cover
.................................................................................... 5
G
General-purpose magnetic flux vector control
(Pr. 71, Pr. 80)
........................................................................ 70
H
Heatsink overheat pre-alarm (FIN signal)
High speed operation command (RH signal)
I
Initial settings and specifications of RS-485 communication
(Pr. 117 to Pr. 120, Pr. 123, Pr. 124, Pr. 549)
Input phase loss (E.ILF)
.................................................. 141, 251
Input terminal function selection(Pr. 178 to Pr. 182)
Input Terminal Status
.............................................................. 123
Input/output phase loss protection selection
(Pr. 251, Pr. 872)
.................................................................. 141
Inrush current limit circuit fault (E.IOH)
................................. 253
Insulation resistance test using megger
............................... 271
Inverter I/O Terminal Monitor
......................................... 123, 126
Inverter installation environment
................................................ 7
Inverter operation ready (RY signal)
............................. 114, 116
Inverter output shutoff signal (MRS signal, Pr. 17)
Inverter overload trip (electronic thermal relay function)
(E.THT)
............................................................................ 95, 250
Inverter placement
..................................................................... 10
Inverter reset (Err.)
........................................................... 244, 247
Inverter reset (RES signal)
............................................. 108, 244
Inverter run enable signal(FR-HC/FR-CV connection) (X10
signal)
............................................................................. 105, 108
Inverter running (RUN signal)
........................................ 114, 116
Inverter thermal load factor
..................................................... 123
Inverter-generated noises and their reduction techniques
J
Jog operation (Pr. 15, Pr. 16)
................................................... 86
JOG operation selection (JOG signal)
............................ 86, 108
L
Leakage currents and countermeasures
................................ 34
Life alarm (Y90 signal)
.................................................... 114, 226
Load pattern selection (Pr. 14)
................................................. 82
Low-speed operation command (RL signal)
Appendix1 Index
Содержание FR-D700 Series
Страница 11: ...VII MEMO ...
Страница 23: ...12 MEMO ...
Страница 57: ...46 MEMO ...
Страница 262: ...258 MEMO ...
Страница 276: ...272 MEMO ...
Страница 283: ...279 APPENDIX This chapter provides the APPENDIX of this product Always read the instructions before using the equipment ...
Страница 287: ...283 MEMO ...
Страница 289: ......