
Gemini VII
Preparing for Analysis
239-42828-01 - Dec 2012
3-21
Installing the Sample Tube
Follow the steps below to attach the sample tube to the analysis port and the balance tube to the bal-
ance port. Minimize sample exposure to air by completing the steps quickly.
1.
Remove the sample tube stopper.
2.
Place the connector nut, ferrule, and O-ring onto the sample tube stem.
The sample tube ferrule is tapered slightly on one end. The ferrule may be installed onto the
sample tube with the tapered end in the up or down position.
3.
Attach the sample tube to the analysis port. Ensure it is fully in the port. Secure it in place by
screwing the connector nut onto the analysis port. Hand-tighten the connector nut.
4.
If the balance tube is not installed, attach it to the balance port following the above procedures. If
a filler rod was used in the sample tube, one must be used in the balance tube.
If analyzing samples with a surface area of 1.0 m
2
or less, use filler rods in the sample
and balance tubes. Refer to
ANALYZING SAMPLES WITH TOTAL SURFACE
.
It is not necessary to remove and replace the balance tube between analyses unless it
has been contaminated or if using a different size sample tube.
O-ring
Ferrule
Connector nut
Sample tube
Содержание Gemini VII 2390a
Страница 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Страница 4: ......
Страница 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Страница 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Страница 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Страница 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Страница 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Страница 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Страница 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Страница 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Страница 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Страница 264: ......
Страница 266: ......
Страница 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Страница 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Страница 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Страница 373: ...OPERATOR MANUAL Smart VacPrep Operator Manual Nov 2013 SMART VACPREP INTELLIGENT VACUUM SAMPLE PREPARATION SYSTEM...
Страница 380: ...Contact Us vi Smart VacPrep Operator Manual...
Страница 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Страница 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...