Disassembly and Reassembly
16 - 15
Injector Head
- Syringe Heat Maintainer
(continued)
3. Install the wires/pins into the J29 connector housing (white -Pin 1,
black -Pin 2). Ensure that the tangs lock into place when inserting
pins into the connector housing. After installing the wires/pins, gently
tug on each wire to verify that the pins are secured in the connector.
4. Reconnect the P29/J29 connectors and the injector head to the
injector unit, and apply unit power. The heater should feel warm
within a few minutes. If the over-temperature light illuminates, place
the syringe heat maintainer on a pressure jacket; the light should
extinguish within a few minutes. If the over temperature light remains
lit, the assembly is defective.
5. After verifying correct operation, remove unit power. Reinstall the
bottom cover and retainer screws.
Содержание ProVis Mark V
Страница 1: ...Service Manual KMP 870 98411 T 205 Rev D...
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 15: ...Operating Guide 3 1 3 Operating Guide...
Страница 16: ...Mark V ProVis Injection System 3 2...
Страница 30: ...Mark V ProVis Injection System 7 4 Figure 7 1 Block Diagram Servo Control Card...
Страница 31: ...Servo Control Card 7 5...
Страница 37: ...Mark V ProVis Injection System 9 4 Figure 9 1 Block Diagram Control Panel Digital Logic...
Страница 39: ...Mark V ProVis Injection System 9 6 Figure 9 2 Block Diagram Control Panel DC to DC Converter...
Страница 49: ...Mark V ProVis Injection System 10 10 NOTES...
Страница 60: ...Injector Head 13 7 Figure 13 1 Block Diagram Head Card...
Страница 61: ...Mark V ProVis Injection System 13 8 NOTES...
Страница 64: ...Imaging System Interface 14 3 Figure 14 1 Connector Locations...
Страница 67: ...Mark V ProVis Injection System 14 6 Figure 14 2 Block Diagram Imaging System Interface...
Страница 71: ...Mark V ProVis Injection System 14 10 NOTES...
Страница 107: ...Mark V ProVis Injection System 15 36 NOTES...