Mark ProVis Injection System
4 - 6
Leakage
Check
To insure safe operation of the injection system, an electrical leakage
check must be part of regular maintenance.
Use a commercial leakage tester such as one of the following:
Manufacturer
Model
Bio-Tek Instruments, Inc.
Model 601 PRO
Electrical Safety Analyzer
Bender
Unimet 1000 ST
Bapco
IEC601L
1. With the AC ground open, power applied, and the line at normal,
leakage should be less than 100 micro amps at 110V, or 300 micro
amps at 220V.
2. With the AC ground open, power applied and the line reversed,
leakage should be less than 100 micro amps at 110V, or 300 micro
amps at 220V
3. Disconnect the leakage test device.
Ground
Continuity
Check
A ground continuity check must also be a part of regular maintenance
of the injection system.
1. Disconnect the injector from the power source.
2. Using an ohm meter, measure the resistance between the ground
terminal on the power cord and any exposed grounded metal sur-
face of the system. The resistance measured must be less than
0.2 ohms.
Содержание ProVis Mark V
Страница 1: ...Service Manual KMP 870 98411 T 205 Rev D...
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 15: ...Operating Guide 3 1 3 Operating Guide...
Страница 16: ...Mark V ProVis Injection System 3 2...
Страница 30: ...Mark V ProVis Injection System 7 4 Figure 7 1 Block Diagram Servo Control Card...
Страница 31: ...Servo Control Card 7 5...
Страница 37: ...Mark V ProVis Injection System 9 4 Figure 9 1 Block Diagram Control Panel Digital Logic...
Страница 39: ...Mark V ProVis Injection System 9 6 Figure 9 2 Block Diagram Control Panel DC to DC Converter...
Страница 49: ...Mark V ProVis Injection System 10 10 NOTES...
Страница 60: ...Injector Head 13 7 Figure 13 1 Block Diagram Head Card...
Страница 61: ...Mark V ProVis Injection System 13 8 NOTES...
Страница 64: ...Imaging System Interface 14 3 Figure 14 1 Connector Locations...
Страница 67: ...Mark V ProVis Injection System 14 6 Figure 14 2 Block Diagram Imaging System Interface...
Страница 71: ...Mark V ProVis Injection System 14 10 NOTES...
Страница 107: ...Mark V ProVis Injection System 15 36 NOTES...