Preventive Maintenance
4 - 3
Inspection
Procedures
The following procedures are recommended for all the components of the
injection system. If defects are detected, either repair the system, or call
MEDRAD for service.
Do not use the unit until the problem has been cor-
rected.
Injector Head
1. Inspect the housing for any cracks that could allow fluid to leak inside,
or weaken the structural integrity of the unit.
2. Inspect the head cable for cuts, cracks, or worn areas.
3. Inspect the head connector for cracks, loose pins, or a loose strain
relief.
4. Inspect the injector head control panel for cuts or cracks that could
allow fluid to leak inside.
Syringe Heat
Maintainer
1. Ensure that the device is warm to the touch.
2. Ensure that the LED indicator is not illuminated or flashing when
installed on the pressure jacket/syringe. The lamp may illuminate if the
syringe heat maintainer is not installed on the pressure jacket/syringe.
If the lamp is illuminated while installed on the pressure jacket/syringe,
the heater is too hot and should be replaced.
3. Inspect the cable and connector for cracks, worn areas, loose pins, or
a loose strain relief.
Control Panel
1. Inspect the control panel case for cracks that could allow fluid to leak
inside, or weaken the assembly.
2. Inspect the interconnect cable for cuts, cracks, or worn spots. Inspect
the plug for cracks, loose prongs, loose wires, or a loose strain relief.
3. Inspect the handswitch and cord: Look for cuts, cracks, or worn spots
in the cable; look for cracks and loose parts in the switch and housing.
4. Inspect any other cables connected to the control unit: Look for cuts,
cracks, or worn spots in the cables; look for cracks, loose pins, or
loose strain reliefs on the connectors.
Pedestal Mount
1. Inspect the case and legs for cracks and other defects that could
weaken the structure.
2. Ensure that all mounting bolts and screws are secure.
3. Inspect the connectors on the pedestal for cracks or loose pins.
4. Ensure that the wheels roll smoothly, with no binding and scraping.
5. Ensure that the locking mechanism on all locking wheels is functional.
Содержание ProVis Mark V
Страница 1: ...Service Manual KMP 870 98411 T 205 Rev D...
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 15: ...Operating Guide 3 1 3 Operating Guide...
Страница 16: ...Mark V ProVis Injection System 3 2...
Страница 30: ...Mark V ProVis Injection System 7 4 Figure 7 1 Block Diagram Servo Control Card...
Страница 31: ...Servo Control Card 7 5...
Страница 37: ...Mark V ProVis Injection System 9 4 Figure 9 1 Block Diagram Control Panel Digital Logic...
Страница 39: ...Mark V ProVis Injection System 9 6 Figure 9 2 Block Diagram Control Panel DC to DC Converter...
Страница 49: ...Mark V ProVis Injection System 10 10 NOTES...
Страница 60: ...Injector Head 13 7 Figure 13 1 Block Diagram Head Card...
Страница 61: ...Mark V ProVis Injection System 13 8 NOTES...
Страница 64: ...Imaging System Interface 14 3 Figure 14 1 Connector Locations...
Страница 67: ...Mark V ProVis Injection System 14 6 Figure 14 2 Block Diagram Imaging System Interface...
Страница 71: ...Mark V ProVis Injection System 14 10 NOTES...
Страница 107: ...Mark V ProVis Injection System 15 36 NOTES...