
Page 102 P/N 03521015 Rev U1
Bio-Medical Devices Intl
17171 Daimler Street Irvine, CA 92614 800-443-3842 www.maxair-systems.com
Don HFR FCC (Optional, depending upon fluid resistance protection desired.)
3. Ensure HFR FCC is down to or below all
around bottom edge of Hood Filter.
1. Initiate donning the HFR FCC (High Fluid Resis-
tant Filter Cover Cap) by placing it over the front
of the Helmet and down towards the back.
2. Continue bringing the HFR
FCC down over the Helmet
so that it covers the HLF.
Don HLF (NOT optional - Required per NIOSH Approval) and Body Gown
1. Initiate donning the HLF (Heavy Loading Filter) by tucking
its back bottom up under back bottom of Helmet
2. Complete by pulling HLF over and down, rear-to-front, of the
Helmet and secure front bottom on Hood front Velcro strip.
3. Place back of outer Shroud over Helmet and don
outer gown per gown manufacturer’s protocol.
Place inner Shroud inside outer gown and close
gown. Pull outer shroud down all around gown.
4. Pull Neck ties loose from behind, pull them around in front and tie securely, within
approximately one-half inch of the neck.
Similarly, loosen body ties and pull them around and through the slots in the lower
front outer shroud, and tie securely.
2. Continue rolling and lifting HLF up, over, and off the Helmet and
discard appropriately,
or, ALTERNATIVELY,
temporarily leave it on and proceed to Doff with Hood (next section).
1. Hold front of HFR FCC in
place while lifting its rear
up over Helmet.
1. Begin HLF doffing by curling its back bottom up over Helmet back
bottom.
Doff HFR FCC (If it was Donned)
2. Remove HFR FCC com-
pletely and decon for next
use.
Doff HLF