2.0 Installation
Info:
All power to operate the remote control is provided by the
inverter/charger through the remote cable.
6. While monitoring the front of the remote, connect the other end of the cable
into the RJ11 jack on the backside of the remote (see Figure 2-3).
7. Immediately upon connecting the remote cable, all the LED’s will come on
as the unit goes through a self-test. After the initial self-test completes, text
should appear with a system status message indicating the current state of
the inverter/charger. If not, please refer to the troubleshooting section.
8. Secure the remote to the wall using the four 6 x 3/4” screws provided.
9. The remote is ready for setup.
REM O TE Port
(blue label )
RJ 11 connection
M agnum Inverter
Rem ote cable
M E-A RC
R em ote Co ntrol
(ba ck v iew )
Figure 2-3, Remote Control Connections
2.5 Power-up Routine
Power up Routine:
When the ME-ARC is first connected to the inverter
a power up routine is initialized. During the power up routine the LCD will
read: Magnum Energy, Self Test, (C) 2009, Connecting to..., ME-ARC V #.#,
INV/CHG V #.#.
After the initial power up routine is finished the remote will be displaying
“Set Clock”.
•
Figure 2-4, Power Up Routine
Magnum Energy
Self Test
( C ) 2009
Connecting to…..
ME-ARC V #.#
INV/CHG V #.#