CentreVu Supervisor Version 8 Installation and Getting Started
Using CentreVu Supervisor Reports
Selecting Report Run Dates
7-9
— If the input needed is for one month, the following window displays:
This window is used in monthly reports where the data is for a single
month. The form initially displays with the values in the input field or
to the month previous to the current month when the input field is
empty. Select a single month and year for the report. The minimum
date is January 1980, and the maximum date is December 2055.
— If the input needed is for more than one month, the following window
displays:
This window is available in monthly reports where the data is for one
or more months. The report runs, beginning with the month entered in
the First Month: field, and going through as many months as are
specified in the Number of Months: field.
The months are in calendar order in the drop-down box, with the
minimum date being January 1980, and the maximum date December
2055.
Содержание CentreVu Supervisor
Страница 6: ...Introduction...
Страница 12: ...CentreVu Supervisor Version 8 Installation and Getting Started xii...
Страница 34: ...CentreVu Supervisor Version 8 Installation and Getting Started Introduction CMS System Capacities 1 16...
Страница 270: ...CentreVu Supervisor Version 8 Installation and Getting Started Overview A 8...
Страница 284: ...CentreVu Supervisor Version 8 Installation and Getting Started GL 14...
Страница 306: ......