CentreVu Supervisor Version 8 Installation and Getting Started
Using CentreVu Supervisor Reports
Selecting Report Run Dates
7-8
If you want to choose a date that is not in the current month, use the
arrow keys at the bottom of the window to scroll through the months.
— If the input needed is for more than one date, the following window
displays:
To select specific dates, use your mouse to point at a day and click.
The day highlights. You can select as many days as you want.
To select a range of dates, select the Range button, point-and-click on
the first day of the desired range, then point-and-click on the last day
of the desired range. The dates selected highlight. You can select as
many ranges as you want to, but you must select the Range button in
order to define each range.
If you want to choose a date that is not currently displayed, use the
arrow keys at the bottom of the window to scroll through the months.
To clear your current selections, select the Clear button.
Содержание CentreVu Supervisor
Страница 6: ...Introduction...
Страница 12: ...CentreVu Supervisor Version 8 Installation and Getting Started xii...
Страница 34: ...CentreVu Supervisor Version 8 Installation and Getting Started Introduction CMS System Capacities 1 16...
Страница 270: ...CentreVu Supervisor Version 8 Installation and Getting Started Overview A 8...
Страница 284: ...CentreVu Supervisor Version 8 Installation and Getting Started GL 14...
Страница 306: ......