![LI-COR li-6262 Скачать руководство пользователя страница 68](http://html.mh-extra.com/html/li-cor/li-6262/li-6262_instruction-manual_1906652068.webp)
FCT 46-49
System Software
5-23
46 Integration A
During the integration (FCT 09), channel 46 shows the total area A under the
peak from the last integration, or the accumulating area during the present
integration.
*46
47 Integration Peak Value
Displays the peak value of the target channel obtained during the last
integration, or the largest value so far during the present integration.
*47
49 Software Revision I.D.
Rev ID 2.02
Software revision number. Press
FCT to escape.
*49