Applications
FlexLine, 191
9.13.6
Subapplication Stake Slope
Description
The subapplication Stake Slope is used to stake out the catch point, which is the
intersection point of a defined slope with the natural surface.
The slope is always defined as starting from a hinge point. If the parameter offset
right/left and height difference are not entered, the point at the defined chainage on
the horizontal alignment is the hinge point.
Access
Press
STK-SLP
from the
Define Stake/Check/Slope
values screen.
P1
Measured point
a
Horizontal alignment
b
Defined offset
c
Defined height difference
d
Hinge point
e
Defined slope
f
Catch point
g
Natural surface
h
Δ
Offset to catch point
i
Cut/fill to catch point
j
Offset to hinge point
k
Offset to alignment
l
Height difference to hinge point
m
Height difference to alignment
TSOX_056
P1
f
e
i
h
g
a
c
b
k
l
m
j
d