8.
Enter the numerical value for byte 1. Confirm the value with the Enter
key [OK].
The numerical values are entered byte by byte. From top
to bottom, from byte 1 to byte 4, for example 120.0.0.13
(Byte1.Byte2.Byte3.Byte4).
Press [ESC] to cancel the entry.
9.
Enter the numerical values for byte 2, byte 3 and byte 4.
10. Once you have entered the numerical values, press the left arrow key.
You return to the
LAN configuration
menu.
11.
Scroll to the numerical values of the [Local mask] menu item and
press the Enter key.
The
Local mask
menu opens.
12.
Enter the numerical values, as described in points 7 to 9.
13.
Once you have entered the numerical values, press the left arrow key.
You return to the
LAN configuration
menu.
14. If required, also enter the numerical values for the [Gateway] and
[DNS server].
15.
Once you have entered the numerical values, press the left arrow key.
The entered numerical values of [Local IP address], [Local mask],
[Gateway] and [DNS server] are displayed.
16.
Press the [ANW.] softkey to accept the entered numerical values.
17.
Press the left cursor key to the move up one menu level and select the
PC control
menu item and press Enter.
18.
Confirm the [PC control] entry once more.
19.
Select the option [On] and confirm the entry.
The control for the control station is activated.
No settings are accepted if you leave the LAN configuration menu
without first pressing the
[ANW.]
key.
Set the
[DHCP client]
from
[off]
to
[on]
, all numerical values are
reset to 0. 0. 0. 0.
If you have set up an Ethernet communication between the control
station and the constant temperature equipment, it may take 1 or
2 minutes to establish the connection.
V4
Integral process thermostats with flow control unit
40 / 171
Содержание IN 550 XT
Страница 61: ...5 3 2 Menu structure Fig 26 Menu Part 1 V4 Integral process thermostats with flow control unit 61 171...
Страница 157: ...14 Declaration of Conformity and certificates V4 Integral process thermostats with flow control unit 157 171...
Страница 158: ...Fig 85 Declaration of Conformity V4 Integral process thermostats with flow control unit 158 171...
Страница 159: ...Fig 86 Declaration of Conformity V4 Integral process thermostats with flow control unit 159 171...
Страница 161: ...V4 Integral process thermostats with flow control unit 161 171...
Страница 162: ...V4 Integral process thermostats with flow control unit 162 171...
Страница 171: ...Y Year of construction 23 V4 Integral process thermostats with flow control unit 171 171...