4 Before starting up
4.1
Install device
WARNING!
Rolling away or overturning of the device due to incorrect han-
dling
Impact, crushing
Do not tilt the device.
Position the device on an even, non-slip surface with a
sufficient load carrying capacity.
Actuate the castor brake when setting up the device.
Do not place heavy parts on the device.
WARNING!
Danger of overpressure from high ambient temperature
Injury, escape of refrigerant
Note the permitted ambient temperature.
WARNING!
The function of the overflow or drain is disrupted
Electric shock
Overflow hose and drainage hose must each slope down-
ward separately all the way into a collecting vessel.
CAUTION!
Risk of heat transfer liquid escaping
Scalding, cold burns
The temperature and media resistance of the hoses used for
the device overflow must be suitable for the application.
Installation conditions:
n
Irritant vapors may develop during operation of the device, depending
on the heat transfer liquid and working temperature used. Always ensure
that the vapors are adequately extracted.
n
Note the electromagnetic compatibility (EMC) requirements of the
device
Chapter 1.3 “EMC requirements” on page 10.
n
Do not cover the ventilation openings of the device.
n
Further installation conditions apply to the devices. These are specified
in the technical data
Chapter 13.1 “General data” on page 147.
V4
Integral process thermostats with flow control unit
27 / 171
Содержание IN 550 XT
Страница 61: ...5 3 2 Menu structure Fig 26 Menu Part 1 V4 Integral process thermostats with flow control unit 61 171...
Страница 157: ...14 Declaration of Conformity and certificates V4 Integral process thermostats with flow control unit 157 171...
Страница 158: ...Fig 85 Declaration of Conformity V4 Integral process thermostats with flow control unit 158 171...
Страница 159: ...Fig 86 Declaration of Conformity V4 Integral process thermostats with flow control unit 159 171...
Страница 161: ...V4 Integral process thermostats with flow control unit 161 171...
Страница 162: ...V4 Integral process thermostats with flow control unit 162 171...
Страница 171: ...Y Year of construction 23 V4 Integral process thermostats with flow control unit 171 171...