
Operation
9
Finishing the tying process manually
9.19
BiG Pack 1270
Original Operating Instructions 150000747_02_en
113
1
BP000-148
ü
The machine is shut down and safeguarded,
.
ü
The machine is disconnected from the tractor.
Initiating the tying process:
ü
.
In order to initiate the tying process, move the lever (1) backwards.
9.19
Finishing the tying process manually
BP000-071 / EQ000-072
Knotter gearbox in idle position
The knotter gearbox is in idle position if the trigger roller (1) is in the recess of the cam track (2)
of the knotter gearbox.
The tying process consists of a rotation of the cam track (2).
ü
The machine is shut down and safeguarded,
.
ü
The machine is disconnected from the tractor.
ü
The tying process has been initiated,
Working direction flywheel
Turn the flywheel (3) manually in the working direction (I) until the trigger roll (1) slides in the
recess of the cam disc (2).
Содержание Big Pack 1270
Страница 360: ...II T P LS I III IV T P S1 S2 M1 M2 V1 V2 P1 B1 A1 B2 B1 T1 T T4 P 180 bar B36 100 bar B11 B35 150101911_00 2 4 ...
Страница 362: ...B17 K9 K11 K12 1 2 3 K13 1 3 2 4 B B1 A A1 1 2 5 3 4 150101911_00 3 4 ...
Страница 364: ...B17 K11 1 2 150101911_00 4 4 ...
Страница 366: ... LUFXLW GLDJUDP GRFXPHQW QR YHUVLRQ ODUJH VTX XDUH EDOHU L 3 LJK 6SHHG XW 9DUL XW 3 3 1 0HGLXP RPIRUW IURP PDFKLQH QR ...
Страница 438: ...438 BiG Pack 1270 Original Operating Instructions 150000747_02_en This page has been left blank deliberately ...