![KI WorkZone Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/ki/workzone/workzone_assembly-instructions-manual_1963124029.webp)
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
29
5. Secure two splice plates to the
mounting holes at the underside
of the adjoining rectangular
worksurface. Use four #12 x 1”
screws, two per splice plate
(Figure 2).
Note:
Transitional leg sets can be
identified by their shorter, floor-
level foot, for less restricted user
movement.
6. Carefully turn the peninsula
worksurface right side up. Set
the peninsula worksurface into
position on the splice plates.
Align the mounting holes and
secure the peninsula to the
worksurface from underneath with
four #12 x 1” screws, two per
splice plate (Figure 2).
7. Attach the modesty panel of the
peninsula worksurface to the
transitional leg with two #10 x ½”
screws (Figure 2).
8. Level the peninsula worksurface
by turning the adjustable glides
on the single leg and the corner
leg either in or out (Figure 1).
WorkZone
®
Peninsula Worksurface
Assembly Instructions
5. Secure two splice plates to the
mounting holes at the underside of the
adjoining rectangular worksurface. Use
four #12 x 1” screws, two per splice
plate (Figure 2).
Transitional leg sets can be
identified by their shorter, floor-level foot,
for less restricted user movement.
6. Carefully turn the peninsula
worksurface right side up. Set the
peninsula worksurface into position on
the splice plates. Align the mounting
holes and secure the peninsula to the
worksurface from underneath with four
#12 x 1” screws, two per splice plate
(Figure 2).
7. Attach the modesty panel of the
peninsula worksurface to the transitional
leg with two #10 x ½” screws (Figure 2).
8. Level the peninsula worksurface by
turning the adjustable glides on the single
leg and the corner leg either in or out
(Figure 1).
Note:
WorkZone Peninsula Worksurface
#12 x 1"
screw
transitional
leg set
splice
plate
#10 x / "
screw
1
2
peninsula
worksurface
adjoining
rectangular
worksurface
Figure 2
Figure 2