Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
11
Note:
All table connections
must be securely fastened
before any electrical
connections between
worksurfaces can be installed.
13. To connect power between
worksurfaces, the power/
data door must be un-clipped
from the underside of ganged
worksurfaces. The 10-wire
harnesses can then be accessed
to connect power between
worksurfaces. Route the jumper
cable through access holes of
vertical wireways and
table-to-table wireway. Plug
each end of jumper cable
into the ends of the 10-wire
harnesses (Figure 4).
Note:
The power infeeds
are to be connected to the
power source by a qualified
electrician who must also check
the electrical integrity of the
finished system. These steps are
intended as a guideline for the
installation.
WorkZone
®
Desks - 24”, 30” x 30” through 54” Tops with Power & Data
Assembly Instructions
10. If worksurface assemblies are to be
ganged, attach them together with #12
x 1” screws at table-to-table wireway
and splice plate. Do not tighten at this
time.
11. Level worksurface by turning four
adjustable glides either in or out. The
jambnuts between the adjustable glides
and the bottom of the leg sets must be
tightened up against the bottom of the
leg to secure the adjustable glides
(Figure 3). Tighten screws that gang
worksurfaces at this time.
12. Press worksurface grommets into
wireway holes in worksurface top
(Figure 3). Route the power and data
module cord through the power and
data module hole in the worksurface.
Snap the power and data module into
the module hole (Figure 3). From under
the worksurface, with the power/data
door opened, plug the power cord into
the duplex receptacle on the 10-wire
harness. Check for proper operation of
the power and data module. To open
module push down on the module and it
will pop-up. To close, press downward
and it will snap closed.
All table connections must be
securely fastened before any electrical
connections between worksurfaces can
be installed.
13. To connect power between
worksurfaces, the power/data door
must be un-clipped from the underside
of ganged worksurfaces. The 10-wire
harnesses can then be accessed to
connect power between worksurfaces.
Route the jumper cable through access
holes of vertical wireways and table-to-
table wireway. Plug each end of jumper
cable into the ends of the 10-wire
harnesses (Figure 4).
Note:
10-wire
harness
10-wire
harness
jumper cable
center vertical
wireways
Figure 4
WorkZone with Power & Data - Assembly Instructions
Figure 4