Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
17
New York City Guidelines
A. All components must be installed
by an electrician licensed in New
York City.
B. All branch circuit wiring must be
#12 AWG minimum.
C. Each branch circuit must be fused
at 15 AMP maximum with no
more than 10 outlets per circuit.
D. A service entry box must be
provided with a service panel.
The box must be approximately
2.25 cubic inches for each wire
entering the box plus 2.25 cubic
inches for each wire leaving the
box.
E. Flexible metal conduit from the
supply source to the panel may
not exceed 18 inches in length
and must be hardwired at both
ends, per Article 4 of the New
York Electrical Code.
Note:
The following is a
supplemental assembly
instructions for New York
City Installations. Please refer
to the following steps and
Figure 1 in place of steps 14
through 17 of the rectangular
WorkZone with Power & Data
Assembly Instructions.
1. Begin by mounting the special
length New York 10-wire
harness to the underside of
the table in the same fashion
as prior harnesses mounted
(see step 7, page 9 in standard
rectangular worksurface
instructions) (Figure 1).
2. Next, connect the New York
power-in box to the wire
harness and mount it to the
underside of the table with the
same #12 x 1” screws as the
harness (Figure 1).
3. Remove the cover from the
New York power-in box and a
knock out from the side of the
box where power is to enter
(Figure 1).
4. Route from a power source,
the New York Code customer
supplied flexible conduit,
ten wires through the infeed
outer wireway and through
leg assembly to the power-in
box utilizing all necessary
connectors (not furnished)
(Figure 1).
5. Make standard wire
connections to the wires
inside the power-in box with
wire nuts. Secure the cover
back onto the power-in box to
complete the hook up.
Note:
The power infeeds
are to be connected to the
power source by a qualified
electrician who must also
check the electrical integrity
of the finished system. These
steps are intended as a
guideline for the installation.
WorkZone
®
Desks - New York City Power In-Feed
Assembly Instructions
#10-32 x 1 / "
screw
1
2
infeed
inner wireway
infeed
outer wireway
power infeed
(customer provided)
modesty
panel
mounting
bracket
#12 x 1"
screw
#12 x 1 / "
screw
3
4
worksurface
NY City
power-in box
#12 x 1"
screw
door
clip
wireway
(optional)
New York
10-wire harness
#10 x / "
screw
1
2
duplex
receptacle
#12 x 1"
screw
New York City Guidelines
Note:
A. All components must be installed by
an electrician licensed in New York City.
B. All branch circuit wiring must be #12
AWG minimum.
C. Each branch circuit must be fused at
15 AMP maximum with no more than 10
outlets per circuit.
D. A service entry box must be provided
with a service panel. The box must be
approximately 2.25 cubic inches for each
wire entering the box plus 2.25 cubic
inches for each wire leaving the box.
E. Flexible metal conduit from the supply
source to the panel may not exceed 18
inches in length and must be hardwired
at both ends, per Article 4 of the New
York Electrical Code.
The following is a supplemental
assembly instructions for New York City
Installations. Please refer to the following
steps and Figure 1 in place of steps 14
through 17 of the standard rectangular
WorkZone with Power & Data Assembly
Instructions.
1. Begin by mounting the special length
New York 10-wire harness to the
underside of the table in the same
fashion as prior harnesses mounted (see
step 7 in standard rectangular
worksurface instructions)
(Figure 1).
2. Next, connect the New York power-in
box to the wire harness and mount it to
the underside of the table with the same
#12 x 1" screws as the harness
(Figure 1).
3. Remove the cover from the New York
power-in box and a knock out from the
side of the box where power is to enter
(Figure 1).
4. Route from a power source, the New
York Code customer supplied flexible
conduit, ten wires through the infeed
outer wireway and through leg assembly
to the power-in box utilizing all necessary
connectors (not furnished) (Figure 1).
5. Make standard wire connections to the
wires inside the power-in box with wire
nuts. Secure the cover back onto the
power-in box to complete the hook up.
The power infeeds are to be
connected to the power source by a
qualified electrician who must also check
the electrical integrity of the finished
system. These steps are intended as a
guideline for the installation.
Note:
adjustable
glide
adjustable
glide
jamb-nut
WorkZone with Power & Data - Assembly Instructions
Figure 1
Figure 1
WARNING:
Assembly of all mechanical
frame components must be completed
before making any electrical connections.
All electrically connected furnishings must
also be mechanically connected.