26
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
Tattoo™
Screens - Spine Screen 10-Wire Power
Assembly Instructions
10-Wire Base Power Infeed
Spacer (In-Line) Installation with
Flex Screen Intersection
Note:
All screens must be
mechanically connected together,
with all 10-wire rigid wireways and
screen-to-screen power connections
appropriately installed before adding
power infeed, or connecting infeed to
power source.
Note:
The power infeeds are to be
connected to the power source by
a qualified electrician who must
follow all state and local codes at the
building site and check the electrical
integrity of the finished system.
1. Per the space-planning layout,
determine the location for base
infeed spacer. Make sure that the
screens to receive the base infeed
spacer are near their final location,
and are plumb and level.
2. The two required screen connectors
come with eight molding clips
installed to each (shown uninstalled,
Figure 26), four on each side. At
Spine Screen #1's end, as illustrated,
position the screen connector up
against the vertical frame channel of
Spine Screen #1, with clips oriented
as shown. Using a firm hand, press
at the mounting clips on the screen
connector, one at a time to seat them
into the vertical frame channel at the
end of the Spine Screen #1
(Figure 26 & Detail KK).
3. Position the base infeed spacer as
illustrated with the bottom backside
"tongue" facing at the end of the
adjoining Flex Screen to install. If
the base infeed spacer top is higher
than the top of the Spine Screen #1's
horizontal frame, the spacer is too
tall at the top and must be squarely
cut off from the bottom. Cut required
amount off the bottom, then press
the side of the base infeed spacer
with the molding clips in the vertical
frame channel on Spine Screen #1
taking care to align the top of the
base infeed spacer with the top of
the screen's horizontal frame. Press
forcefully from inside the spacer, to
engage the screen connector/clips
of Spine Screen #1 into the channel
of the base infeed spacer into an
open end of a 10-wire rigid wireway
(Figure 26).
4. Carefully lift and arrange the Flex
Screen foot under the perpendicular
Spine Screen foot, aligning the
Flex Screen against the base infeed
spacer backside during the process
(Figure 26).
Figure 26
Spine
Screen
(#1)
Spine
Screen
(#2)
base infeed
spacer
(in-line)
screen
connector
molding
clip
vertical
spacer
channel
Flex
Screen
bridge
foot
adjustable
glide foot
bottom
backside
“tongue”
Detail KK
Spine
Screen
(#1)
screen
connector
molding clip
(factory installed)
base
infeed spacer
(in-line)
vertical
frame
channel
Содержание Tattoo Flex Screen
Страница 1: ...Assembly Instructions Tattoo Screen System July 2019...
Страница 50: ...50 Tattoo Screens Assembly Instructions...
Страница 51: ...51 Tattoo Screens Assembly Instructions...