Страница 1: ...Assembly Instructions Tattoo Screen System July 2019...

Страница 2: ...se Raceway Power Infeed Installation 21 10 Wire Base Power Infeed Spacer End of Run Installation 22 10 Wire Base Power Infeed Spacer In Line Installation 23 10 Wire Base Power Infeed Spacer In Line In...

Страница 3: ...at Bars Utility Knife Tape Measure Miter Saw with Non Ferrous Blade Assemble units as described herein only To do otherwise may result in instability All screws nuts and bolts must be tightened secure...

Страница 4: ...e screens Lean the screens vertically against a wall at a slight angle If screens must be leaned on edge no more than 12 screens of like size should be in one leaning stack Stack screens with the padd...

Страница 5: ...System New York City Electrical Assembly Instruction KI AI 000045 before proceeding to Spine Screen Foot Assembly instructions on this page Spine Screen Foot Assembly 1 Carefully lay Spine Screen flat...

Страница 6: ...ps bottom screen connector Detail C bottom screen connector molding clip come installed from factory vertical frame channel Detail D Spine Screen Spine Screen instructions on page 14 If an in line 10...

Страница 7: ...ence Leveling Connecting Spine Screens instructions on page 6 7 At the location where two in line screens will be joined at the top place a connector plate over the notch in both horizontal frames Bri...

Страница 8: ...ing a laser alignment tool determine and mark all high and low points on the floor Adjust the level and height of the Spine Screen beginning at the highest point in the floor first To raise the screen...

Страница 9: ...ectrically connected furnishings must also be mechanically connected 1 Per the space planning layout determine the correct location for each numbered receptacle in the system Figure 5 2 Position the d...

Страница 10: ...Installation Note Screen to screen jumpers pass power between the pre mounted 10 wire rigid wireways through the pass through ankles from one screen to another Screen to screen jumpers are 173 4 long...

Страница 11: ...les Detail M Spine Screen powered pass through screen to screen 10 wire jumper pass through ankles 10 wire rigid wireway Spine Screen non powered Pass Through Screen to Screen 10 Wire Jumper Installat...

Страница 12: ...ole to go through at a later step Figure 8 3 Measure from the ceiling down to the floor at the end of the Spine Screen then add 4 to that measurement for required power pole length Take the top infeed...

Страница 13: ...conduit inside the power pole and route the plug end of the infeed down through the pass through ankle and plug it into the end of the 10 wire rigid wireway Figure 9 10 Push the 10 wire end of the po...

Страница 14: ...to reach the ceiling it must be installed before installing the screen connectors Reference Power Pole Extension Installation instructions on page 19 then return to step 4 on this page Spine Screen 1...

Страница 15: ...e ceiling area for later connection to the source power by a certified electrician Figure 11 10 Determine the length of the top infeed power pole cover by measuring the distance from the ceiling to th...

Страница 16: ...ngular hole through the ceiling at 33 8 x 3 as illustrated for the power pole to go through at a later step Figure 12 3 Measure from the ceiling down to the floor at the end of the Spine Screen then a...

Страница 17: ...at the adjustable foot is over the foot of the Flex Screen Detail U Move Spine Screen 2 over to align its installed screen connector clips with the appropriate power pole channel Level and plumb Spine...

Страница 18: ...of the 10 wire rigid wireway Figure 14 11 Push the 10 wire end of the power infeed up and through the top of the power pole and into the above ceiling area for later connection to the source power by...

Страница 19: ...e top infeed power pole and slide the extension bracket into the power pole aligning the mounting holes of both Insert four 10 24 x 1 2 Phillips flat head screws through the power pole and bracket at...

Страница 20: ...e that screen to receive base power infeed is in its final location and is plumb and level 2 At the bottom of the screen frame which will receive base power infeed route the plug end of the 10 wire ba...

Страница 21: ...il EE Base Raceway Power Infeed Installation 1 Position the base infeed adapter receptacle on the end of the 10 wire rigid wireway where the base power infeed is received matching the arrow at the N s...

Страница 22: ...osition the base infeed spacer against the vertical frame with the side opening as desired and the top facing upward If the base infeed spacer top is higher than the top of the Spine Screen s horizont...

Страница 23: ...pening at the bottom of the infeed trim Using a firm hand press to snap molding clips of the base infeed trim into the vertical spacer channel Figure 23 Detail GG 8 On the rib side of the base infeed...

Страница 24: ...of the base infeed spacer Next move the Spine Screen 2 over to align its installed screen connector clips with the appropriate vertical spacer channel Level and plumb Spine Screen 2 to 1 by twisting...

Страница 25: ...of the cover Figure 25 Detail JJ 8 Position the spacer cover with molding clips up against the spacer cover channel with the 10 wire base infeed routed through the opening at the bottom of the spacer...

Страница 26: ...el of Spine Screen 1 with clips oriented as shown Using a firm hand press at the mounting clips on the screen connector one at a time to seat them into the vertical frame channel at the end of the Spi...

Страница 27: ...ne Screen 2 to 1 by twisting the height adjustable glides clockwise or counter clockwise until the frame s vertical edges are aligned and tops of screens are at the same height Press Spine Screen 2 sc...

Страница 28: ...er the flat aluminum top cap will not fit correctly extending too far and disassembly and reassembly will be required 6 Confirm the base infeed top cap is labelled I on the underside for inline Place...

Страница 29: ...ation specified for a screen to screen jumper between the base infeed spacer route the jumper through the pass through ankles at each end of the Spine Screen then plug the ends into each rigid wireway...

Страница 30: ...ss them onto the ribs of the vertical trim as illustrated Figure 31 3 Position the base infeed vertical trim with molding clips up against the vertical frame channel that will receive hardwired base p...

Страница 31: ...se wireway channels A standard cutout for data plates in base raceway trim is provided Figure 33 2 Data cables must be routed and placed underneath the 10 wire rigid wireway in the bottom wireway chan...

Страница 32: ...line As labeled the top caps are designed to install to a specific spacer Take care and follow the directions below when installing the top cap If proper top cap is not installed to the proper spacer...

Страница 33: ...ess forcefully from inside the spacer to engage the screen connector clips of Spine Screen 1 into the channel of the base infeed spacer Next move Spine Screen 2 over to align its installed screen conn...

Страница 34: ...inst the vertical frame channel of Spine Screen 1 with clips oriented as shown Using a firm hand press at the mounting clips on the screen connector one at a time to seat them into the vertical frame...

Страница 35: ...d plumb Spine Screen 2 to 1 by twisting the height adjustable glides clockwise or counter clockwise until the frame s vertical edges are aligned and tops of screens are at the same height Press Spine...

Страница 36: ...proper spacer the flat aluminum top cap will not fit correctly extending too far and disassembly and reassembly will be required 6 Confirm the spacer top cap is labelled I on the underside for inline...

Страница 37: ...wireway Figure 41 9 On the rib side of the spacer cover space molding clips evenly apart and press them onto the ribs of the cover Figure 41 Detail BBB 10 Position the spacer cover with molding clips...

Страница 38: ...a qualified electrician who must follow all state and local codes at the building site and check the electrical integrity of the finished system Note All screens must be mechanically connected togeth...

Страница 39: ...run vertical trim with molding clips up against the vertical frame channel Using a firm hand press on the vertical trim at the molding clip locations to snap molding clips into the vertical frame cha...

Страница 40: ...as illustrated Figure 45 4 Position the vertical trim with molding clip s up against the vertical frame channel Using a firm hand press on the trim at the molding clips to snap molding clips into the...

Страница 41: ...nstructions Flat Aluminum Top Cap Installation 1 On the rib side of the flat aluminum top cap space molding clips evenly apart and press them onto the ribs of the top cap as illustrated Figure 46 2 Po...

Страница 42: ...ns In Line Flex Screens Note Reference Details A B C D for in line Flex Screen configuration options 1 Carefully lift and arrange Flex Screens in line to each other per the space planning layout Figur...

Страница 43: ...screen s flat foot Reference Details E F for Flex Screen corner intersection configuration options 1 Carefully lift and arrange the Flex Screens to be perpendicular to each other per the space planni...

Страница 44: ...to each other One screen will be placed up against the middle of the perpendicular screen Feet do not intersect in mid panel intersection configurations Reference Details G H for Flex Screen mid pane...

Страница 45: ...lex Screens in the 3 Way configuration must be placed together with the flat feet adjacent to each other The perpendicular screen must have the bridge or adjustable glide foot bridge over the in line...

Страница 46: ...e in line Flex Screens feet in the 3 Way configuration must be placed individually under the perpendicular Spine Screen adjustable glide foot Once both in line Flex Screen feet are under the perpendic...

Страница 47: ...connector as illustrated Figure 1 2 Position the topper connector with molding clips up on top of the horizontal frame channel Using a firm hand press the topper connector down at the molding clip loc...

Страница 48: ...1 2 Details A B C D Note The slide panel has a writable magnetic surface on one side and a tack board on the other side Depending on which nylon glide you insert first will determine which slide pane...

Страница 49: ...e of the nylon glide to hold the coat hook in place Figures 3 4 Details E F G 3 Two coat hook stoppers are included with each coat hook kit The stoppers can be used to prevent the coat hook from accid...

Страница 50: ...50 Tattoo Screens Assembly Instructions...

Страница 51: ...51 Tattoo Screens Assembly Instructions...

Страница 52: ...Street P O Box 8100 Green Bay Wisconsin 54308 8100 1 800 424 2432 www ki com KI is a registered trademark of Krueger International Inc 2019 Krueger International Inc All Rights Reserved Code KI AI 000...