18
Chapter 2
Performance Test
Introduction
Introduction
This chapter provides the performance tests outline for Keysight E4981A. The
performance test names are listed in
Table 2-1
. The test descriptions are described
sequentially in the following pages.
NOTE
Allow the analyzer to warm up for at least 30 minutes before you execute any of the
performance tests.
Perform all performance tests in an ambient temperature of 23
±
5
⋅
C
NOTE
The performance tests should be performed periodically. The recommended test interval is
12 months.
The test interval depends on maintenance and the environmental conditions under which
the instrument is used. You may find that the interval could be shortened or lengthened;
however, such a decision should be based on substantial quantitative data.
Test Equipment Required
The required equipment for the performance test is listed in
. Use only calibrated
equipment when doing the performance test.
Table 2-1
List of the
E4981A
performance tests
Para.
Title
1
Test Signal Frequency Accuracy Test
2
Test Signal Level Accuracy Test
3
Impedance Measurement Accuracy Test
Содержание E4981A
Страница 1: ...Keysight E4981A 120 Hz 1 kHz 1 MHz Capacitance Meter Service Guide ...
Страница 2: ......
Страница 13: ...Contents 11 L 145 M 145 N 145 O 146 P 146 Q 146 R 147 S 147 T 147 U 148 Warning Message 149 ...
Страница 14: ...12 Contents ...
Страница 70: ...68 Chapter4 Troubleshooting Performance test failure troubleshooting ...
Страница 84: ...82 Chapter5 Replaceable Parts Replaceable Parts List Front Panel Figure 5 12 Front Panel ...
Страница 96: ...94 Chapter6 Replacement Procedure 3 4 Rack Module Top Replacement Figure 6 3 Screw Fastening Sequence ...
Страница 98: ...96 Chapter6 Replacement Procedure PSU Deck Assembly Removale Figure 6 4 PSU Deck Assembly Removal ...
Страница 100: ...98 Chapter6 Replacement Procedure PSU Assembly Replacement Figure 6 5 PSU Assembly Replacement ...
Страница 102: ...100 Chapter6 Replacement Procedure Front Chassis Assembly Removal Figure 6 6 Front Chassis Assembly Removal ...
Страница 104: ...102 Chapter6 Replacement Procedure Front Panel Assembly Removal Figure 6 7 Front Panel Assembly Removal ...
Страница 108: ...106 Chapter6 Replacement Procedure Interface Board Assembly Replacement Figure 6 10 Screw Fastening Sequence ...
Страница 118: ...116 Chapter6 Replacement Procedure Power Inlet Assembly Replacement Figure 6 17 Power Inlet Assembly Replacement ...
Страница 122: ...120 Chapter6 Replacement Procedure Inverter Assembly Replacement Figure 6 20 Inverter Assembly Replacement ...
Страница 124: ...122 Chapter6 Replacement Procedure Display Support Removal Figure 6 21 Display Support Removal ...
Страница 132: ...130 Chapter7 Post Repair Procedures Post Repair Procedures ...
Страница 138: ...136 AppendixB Firmware Update Update the E4981A firmware using USB cable ...
Страница 139: ...137 1 Chapter Title 2 Chapter Title 4 Chapter Title 5 Chapter Title C Power Requirement C Power Requirement ...
Страница 142: ...140 AppendixC Power Requirement Power Requirements ...