BOP HIPWR 080709
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR. 2.3. If any indication of damage is
found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS AND CONTROLS
a) Front Panel: Refer to Figure 3-1 and Table 3-1.
b) Rear Panel: Refer to Figure 2-1 and Table 2-1.
FIGURE 2-1. BOP SERIES REAR PANEL
Содержание BOP 1000W
Страница 2: ......
Страница 10: ......
Страница 20: ......
Страница 31: ......
Страница 32: ......
Страница 36: ......
Страница 50: ...FIGURE 2 2 LOAD CONNECTIONS LOCAL SENSING...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 61: ...FIGURE 2 11 POWER ON DEFAULT SCREEN FOR SLAVE UNIT 2 8 4 OPERATING INSTRUCTIONS FOR MULTIPLE UNIT COMBINATIONS...
Страница 63: ...080709 C 25 FIGURE 2 12 3 X 2 3 SERIES X 2 PARALLEL CONFIGURA TION LOCAL SENSING TYPICAL 2 25 2 26 Blank 24 25...
Страница 64: ......
Страница 68: ...FIGURE 3 3 POWER UP SCREEN SHOWING GRAPHIC METERS VOLTAGE 0000 0...
Страница 125: ......
Страница 128: ......