Technician's instructions KEY Laser III 1243
2 Measuring and configuration
|
2.2 Optical system
▶ Carefully push the new Er:YAG crystal ⑦ by its sleeves and on its axis, into the
pump chamber.
▶ Mount the two O-rings, gently screw on the flanges ⑥, centre the Er:YAG crystal
⑦ and then tighten the flanges.
Note
Do not damage the flash lamp connection.
133/176