Technician's instructions KEY Laser III 1243
2 Measuring and configuration
|
2.2 Optical system
13
12
14
▶ Screw down bonding 12 tightly and connect connection 13.
▶ Screw the safety switch (14) down tightly.
Note
Startup should then follow installation instructions at least from the section "Input
block position".
124/176