02.15 EN
64
3.3
Checks and operations to be carried out when the truck is
operational
WARNING!
Risk of accident due to damage to or other defects in the truck and optional
features
If damage or other truck or attachment (optional equipment) defects are discovered
during the following checks, the truck must be taken out of service until it has been
repaired.
X
Report any defects immediately to your supervisor.
X
Mark defective truck and take out of service.
X
Do not return the industrial truck to service until you have identified and rectified the
fault.
Procedure
• Test warning indicators and safety devices:
• Test the emergency disconnect function by pressing the emergency disconnect
switch. The main circuit is disconnected and no truck operations can be
performed. Now pull the emergency disconnect switch to unlock it.
• Test the horn by pressing the "warning signal" button.
• Check braking efficiency, see "Brakes" on page 77.
• Test the steering, see "Steering" on page 77.
• Test the hydraulic system, see "Load handler raise/lower" on page 79.
• Test travel operations, see "Travel" on page 72.
• Test the safety collision switch by applying it while travelling in the drive direction
in pedestrian mode.
• Test the controls and displays and check for damage, see "Displays and Controls"
on page 57.
Содержание ERE 120
Страница 1: ...07 12 02 15 51222183 ERE 120 Operating instructions G ERE C20 ERE 120...
Страница 3: ...02 15 EN 4...
Страница 9: ...02 15 EN 10...
Страница 11: ...0506 GB 2...
Страница 35: ...02 15 EN 34 The truck can now be lifted by crane...
Страница 39: ...02 15 EN 38...
Страница 55: ...02 15 EN 54...
Страница 58: ...57 02 15 EN 2 Displays and Controls V R 49 50 5 51 50 49 11 52 53 54 7 9 8 10 6 5 48 48...
Страница 64: ...63 02 15 EN 54 56 51 6 9 52 8...
Страница 76: ...75 02 15 EN R V R V 0 B B B F 5 48 8 10 6 5 48 11...
Страница 88: ...87 02 15 EN...
Страница 93: ...02 15 EN 92 WARNING Only return the truck to service when you have identified and rectified the fault 57...
Страница 157: ......