![Jungheinrich ERE 120 Скачать руководство пользователя страница 170](http://html1.mh-extra.com/html/jungheinrich/ere-120/ere-120_operating-instructions-manual_2032072170.webp)
13
03.13 EN
5.3
Servicing PzV and PzV-BS lead-acid batteries with sealed armour
plated cells
Z
Do not add water!
5.3.1 Daily
– Charge the battery after each discharge.
5.3.2 Weekly
– Visually inspect for dirt and physical damage.
5.3.3 Every three months
– Measure and record the overall voltage.
– Measure and record the individual voltages.
– Compare the results with the previous ones.
Z
Carry out the measurements after full charging and subsequent resting for at least
5 hours.
Z
If you find significant differences compared with the previous measurements or
differences between the cells, contact the manufacturer's customer service
department.
5.3.4 Annually
– Measure the truck insulation resistance in accordance with EN 1175-1.
– Measure the battery insulation resistance in accordance with EN 1987-1.
Z
In accordance with DIN EN 50272-3 the battery insulation resistance should not be
less than 50
ȍ
per volt of rated voltage.
Содержание ERE 120
Страница 1: ...07 12 02 15 51222183 ERE 120 Operating instructions G ERE C20 ERE 120...
Страница 3: ...02 15 EN 4...
Страница 9: ...02 15 EN 10...
Страница 11: ...0506 GB 2...
Страница 35: ...02 15 EN 34 The truck can now be lifted by crane...
Страница 39: ...02 15 EN 38...
Страница 55: ...02 15 EN 54...
Страница 58: ...57 02 15 EN 2 Displays and Controls V R 49 50 5 51 50 49 11 52 53 54 7 9 8 10 6 5 48 48...
Страница 64: ...63 02 15 EN 54 56 51 6 9 52 8...
Страница 76: ...75 02 15 EN R V R V 0 B B B F 5 48 8 10 6 5 48 11...
Страница 88: ...87 02 15 EN...
Страница 93: ...02 15 EN 92 WARNING Only return the truck to service when you have identified and rectified the fault 57...
Страница 157: ......