Operation
5.2.1 Commissioning
Checks and operations to be performed before starting daily work
Procedure
• Make sure the battery is in physically good condition.
• Make sure the terminals are correct (positive to positive and negative to negative)
and check that contacts on the battery terminal conducting system are secure.
• Check the terminal screw torques (M10 = 23 ±1 Nm) of the terminal conductors and
connectors.
• Re-charge the battery.
• Charge the battery.
Check completed.
5.2.2 Discharging the battery
Z
To achieve an optimum useful life avoid operational discharges of more than 60%
of nominal capacity.
Z
If the battery is discharged during operation by more than 80% of rated capacity the
useful life of the battery will reduce significantly. Fully or partially discharged
batteries must be re-charged immediately and not left unattended.
5.2.3 Charging the battery
WARNING!
The gases produced during charging can cause explosions
The battery gives off a mixture of oxygen and hydrogen (electrolytic gas) during
charging. Gassing is a chemical process. This gas mixture is highly explosive and
must not be ignited.
X
Always disconnect the charger and truck before connecting or disconnecting the
charger and battery.
X
The charger must be adapted to the battery in terms of voltage, charge capacity
and battery technology.
X
Before charging, check all cables and plug connections for visible signs of damage.
X
Ventilate the room in which the truck is being charged.
X
Battery cell surfaces must remain exposed during charging in order to ensure
sufficient ventilation, see truck operating instructions, chapter D, Charging the
Battery.
X
Do not smoke and avoid naked flames when handling batteries.
X
Wherever an industrial truck is parked for charging there must be no inflammable
material or consumables capable of creating sparks within a minimum distance of
2 m from the truck.
X
Fire protection equipment must be available.
X
Do not place any metallic objects on the battery.
X
Always follow the safety regulations of the battery and charger station
manufacturers.
Содержание ERE 120
Страница 1: ...07 12 02 15 51222183 ERE 120 Operating instructions G ERE C20 ERE 120...
Страница 3: ...02 15 EN 4...
Страница 9: ...02 15 EN 10...
Страница 11: ...0506 GB 2...
Страница 35: ...02 15 EN 34 The truck can now be lifted by crane...
Страница 39: ...02 15 EN 38...
Страница 55: ...02 15 EN 54...
Страница 58: ...57 02 15 EN 2 Displays and Controls V R 49 50 5 51 50 49 11 52 53 54 7 9 8 10 6 5 48 48...
Страница 64: ...63 02 15 EN 54 56 51 6 9 52 8...
Страница 76: ...75 02 15 EN R V R V 0 B B B F 5 48 8 10 6 5 48 11...
Страница 88: ...87 02 15 EN...
Страница 93: ...02 15 EN 92 WARNING Only return the truck to service when you have identified and rectified the fault 57...
Страница 157: ......