C 1
0406
.GB
C Transport and Commissioning
1
Lifting by crane
F
Only use lifting gear with sufficient
capacity (for truck weight see truck
data plate, Chapter B).
Z
Lifting gear attachment points (1) are
provided on the chassis and the fork in
case the truck is to be lifted or
transported by crane.
– Park the truck securely (see
Chapter E).
– Secure the lifting slings to the
attachment points (1).
M
The lifting gear must be attached to the
attachment points in such a manner
that it cannot slip under any
circumstances and cannot come into
contact with any attachments of the
truck when the truck is lifted.
2
Using the truck for the first time
M
Drive the truck using battery power only! Rectified AC current will damage
the electronic components. Battery connecting leads (trailing cables) must be less
than 6m long.
To prepare the truck after delivery or after transport, proceed as follows:
– Make sure the truck’s equipment is complete and in a satisfactory condition.
– Install the battery (if required). Do not damage the battery cable.
– Charge the battery (see Chapter D).
– If necessary, adjust the combination instrument to match the battery type
(see Chapter D).
1
1
1
C 1
0406
.GB
C Transport and Commissioning
1
Lifting by crane
F
Only use lifting gear with sufficient
capacity (for truck weight see truck
data plate, Chapter B).
Z
Lifting gear attachment points (1) are
provided on the chassis and the fork in
case the truck is to be lifted or
transported by crane.
– Park the truck securely (see
Chapter E).
– Secure the lifting slings to the
attachment points (1).
M
The lifting gear must be attached to the
attachment points in such a manner
that it cannot slip under any
circumstances and cannot come into
contact with any attachments of the
truck when the truck is lifted.
2
Using the truck for the first time
M
Drive the truck using battery power only! Rectified AC current will damage
the electronic components. Battery connecting leads (trailing cables) must be less
than 6m long.
To prepare the truck after delivery or after transport, proceed as follows:
– Make sure the truck’s equipment is complete and in a satisfactory condition.
– Install the battery (if required). Do not damage the battery cable.
– Charge the battery (see Chapter D).
– If necessary, adjust the combination instrument to match the battery type
(see Chapter D).
1
1
1
Содержание ECE 118
Страница 1: ...Operating instructions 51092878 ECE 118 G 08 06 07 08...
Страница 3: ...0108 GB 0108 GB...
Страница 7: ...0506 GB 2 0506 GB 2...
Страница 9: ...0406 GB A 2 0406 GB A 2...
Страница 13: ...0708 GB B 4 Dimensions b1 1006 850 0708 GB B 4 Dimensions b1 1006 850...
Страница 17: ...0708 GB B 8 0708 GB B 8...
Страница 27: ...0406 GB D 6 0406 GB D 6...
Страница 30: ...E 3 0406 GB 7 8 7 8 6 6 3 4 13 R V 2 9 10 11 12 1 14 3 E 3 0406 GB 7 8 7 8 6 6 3 4 13 R V 2 9 10 11 12 1 14 3...
Страница 34: ...E 7 0406 GB B R V 13 4 R V 0 3 5 B B B F 14 E 7 0406 GB B R V 13 4 R V 0 3 5 B B B F 14...
Страница 51: ...0406 GB E 24 0406 GB E 24...
Страница 81: ...0506 GB 18 0506 GB 18...