5 Installation
29
Procedure
1
Pouch
2
Clamp
3
Two-component sealing
compound
4
Desiccant packet
5
Maximum fill level
Figure 35: Procedure
1. Cut open the protective enclosure of the two-component
sealing compound (see packaging).
2. Remove the clamp of the sealing compound.
3. Knead both components thoroughly until a good mix is
reached.
4. Cut open the pouch at a corner. Perform work activity within
30 minutes.
5. Carefully fill the terminal box with two-component sealing
compound to above the connecting cable.
6. Wait a few hours before closing the cover to allow the
compound to dry, and to release any possible gas.
7. Ensure that the packaging material and the desiccant packet
are disposed of in an environmentally sound manner.
Change from two to one column
Содержание 406060
Страница 2: ......
Страница 98: ...13 Appendix 98 13 3 Declarations of conformity 13 3 1 JUMO flowTRANS MAG S10...
Страница 99: ...13 Appendix 99...
Страница 100: ...13 Appendix 100...
Страница 101: ...13 Appendix 101...
Страница 102: ...13 Appendix 102...
Страница 103: ...13 Appendix 103...
Страница 104: ...13 Appendix 104 13 3 2 JUMO flowTRANS MAG H10...
Страница 105: ...13 Appendix 105...
Страница 106: ...13 Appendix 106...
Страница 107: ...13 Appendix 107...
Страница 108: ...13 Appendix 108...
Страница 109: ...13 Appendix 109...
Страница 110: ...13 Appendix 110 13 3 3 JUMO flowTRANS MAG 10...
Страница 111: ...13 Appendix 111...
Страница 112: ...13 Appendix 112...
Страница 113: ...13 Appendix 113...
Страница 115: ......