Warnings for servicing
All servicing operations and gas conversions MUST BE CARRIED OUT BY QUALIFIED TECHNI-
CIANS, in compliance with the norms and laws in force (see an indicative list on page 4).
Moreover, MAINTENANCE operations must be carried out in compliance with the manufacturer
prescriptions and with the laws and rules presently in force, for the parts not mentioned in this
handbook; we advice to perform them at least once a year to maintain the boiler’s performance.
A careful servicing is always a guarantee of safety and energy saving.
Normally, it will be necessary to
execute the following operations:
f
Remove any possible oxidization from burners and electrodes;
f
Remove the scale from the exchangers;
f
Check integrity and stability of the insulating coverings in the combustion chamber and proceed
eventually to replacement;
f
Check and eventual replacement of the magnesium anode of the storage unit (see the documenta-
tion supplied with the unit);
f
Check the boiler ignition, switching off and operation;
f
Check the water and gas connections tightness;
f
Check the gas consumption at the minimum and maximum output;
f
Verify that safety devices are correctly working;
f
Verify the correct functioning of control and adjusting devices;
f
Verify periodically the absence of leaks of combustion products to the inner room, the correct func-
tioning and the integrity of the flue outlet ducts and/or devices and of the relevant terminals and
accessories;
f
In case of works or servicing of the structures placed near the above mentioned ducts and /or de-
vices and their accessories, switch off the boiler;
f
Do not leave any inflammable tanks and/or substances in the installation room;
f
If the boiler draws directly from the installation room
(type B appliance installed indoor)
: Do not clean
the room where boiler is installed, while it is working
f
Clean casing with soapy water only. Do not clean casing, other painted or plastic surfaces with thin-
ner�
f
In any case of parts replacement, it is mandatory to use ITALTHERM original spare parts.
ITALTHERM declines any responsibility in case of non-original spare parts utilization.
Содержание CITY GLASS 20 FR
Страница 37: ...Green Heating Technology 37 Notes ...
Страница 48: ...Green Heating Technology 48 Notes ...
Страница 49: ...Green Heating Technology 49 Notes ...