Green Heating Technology
25
f
verify and, if necessary, change the boiler electronic settings to adapt its work to particular system
requirements (see "Main boiler parameters (PC)" on page 27);
Before turning on the boiler, verify that the pump is not blocked due to inactivity: unscrew the
cap located at the centre of the pump’s body, locate the rotor shaft behind the cap and turn it
manually using a screwdriver or other suitable tool.
f
verify that the combustion is correctly regulated: go on in this chapter as described in the paragraph
"Combustion test" on page 29;
During the first ignition of the brand new boiler, it is necessary that burner works for at least
30 minutes, before performing combustion checks. During this time, the fumes of the eventual
residual manufacturing materials are produced, and they could alter the measured values.
f
verify the correct functioning of the boiler in heating and domestic hot water version;
f
fill in the foreseen documentation and leave to the user the copy of his competence.
Access to the inside of the boiler
1.
Unscrew the casing fixing screws
1
and
2
;
2.
pull the casing
3
outwards, then push it upwards (to unhook it from the tongues
4)
and remove it;
3.
unscrew the screw
5
, then slide the control panel
6
upwards and overturn it downwards;
4.
after the regulations, close the boiler repeating everything in the other sense, carefully hooking the
casing
3
to the tongues
4
�
(some items of this picture, not involved
in the description, could be different from
the model that you are operating on)
Содержание CITY GLASS 20 FR
Страница 37: ...Green Heating Technology 37 Notes ...
Страница 48: ...Green Heating Technology 48 Notes ...
Страница 49: ...Green Heating Technology 49 Notes ...