ABK2027IQE01_A - Installation and Operation Manual
11
Contents
Ingeteam
16.1. Safety instructions for the AC connection ................................................................................... 104
16.2. Connection area ....................................................................................................................... 104
16.3. Connecting the AC phases via busbars ....................................................................................... 109
16.4.1. Wiring and terminal requirements for the AC connection ...................................................... 110
16.4.2. AC phases connection process via a terminal ...................................................................... 113
16.5. Connecting the AC neutral ........................................................................................................ 114
16.6. Connecting the Medium Voltage switchgear emergency trip .......................................................... 115
17.1. Configuring the Modbus node .................................................................................................... 116
17.2. Configuring the measurement string numbers ............................................................................. 119
17.3. Monitoring .............................................................................................................................. 119
18.1.1. Inspection ....................................................................................................................... 122
18.1.2. Shutting down ................................................................................................................. 124
18.4.1. Start-up .......................................................................................................................... 125
18.4.2. Checking and measurement .............................................................................................. 126
19.1. Keypad and LEDs .................................................................................................................... 127
19.2. Display ................................................................................................................................... 128
19.3. Menu structure ........................................................................................................................ 129
19.4. Daily power graph .................................................................................................................... 130
19.5. Energy graph for the last 24 days .............................................................................................. 130
19.6. Main menu .............................................................................................................................. 130
19.6.1. Monitoring ...................................................................................................................... 131
19.6.2. Events ............................................................................................................................ 132
19.6.3. Start/Stop ....................................................................................................................... 135
19.6.4. Settings .......................................................................................................................... 136
19.6.5. Advanced settings ............................................................................................................ 136
19.6.6. Inverter data ................................................................................................................... 136
20.1. Process of shutting down the unit .............................................................................................. 137
20.2. Stopping the inverter from the display ........................................................................................ 140
20.3. Inverter shutdown from the emergency stop button ..................................................................... 141
20.4. Inverter shutdown by opening a door .......................................................................................... 141
22.2.1. Frequency of maintenance tasks ....................................................................................... 147
22.2.2. WEEKLY maintenance tasks .............................................................................................. 147
22.2.3. MONTHLY maintenance tasks ........................................................................................... 147
22.2.4. ANNUAL maintenance tasks ............................................................................................. 154
Содержание INGECON SUN 1000TL U B360
Страница 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Страница 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Страница 176: ...Notes...
Страница 177: ...Notes...
Страница 178: ...Notes...
Страница 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...