20.2. Stopping the inverter from the display
It may be necessary on occasions to carry out an isolated unit shutdown without following the protocol explained
under point
“20.1. Process of shutting down the unit”
. This must only be carried out when you do not wish to
gain access to the inside of the inverter and you wish to switch the inverter to shutdown status, stopping delivering
power to the grid.
To do this from the display, switch the inverter to shutdown status. The inverter will stop switching and disconnect
the grid connection AC thermomagnetic circuit breaker.
DANGER
This shutdown procedure does not guarantee complete disconnection of all sources of voltage connected to the
unit, hence accessing the inside of the unit after performing this shutdown is prohibited. If you wish to gain
access to the inside of the inverter, follow the procedure in Section
“20.1. Process of shutting down the unit”
.
141
Shutting down the unit
Ingeteam
Содержание INGECON SUN 1000TL U B360
Страница 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Страница 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Страница 176: ...Notes...
Страница 177: ...Notes...
Страница 178: ...Notes...
Страница 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...