16.3. Connecting the AC phases via busbars
16.3.1. Requirements for the AC phase connection busbars
If using busbars for the AC connection, the requirements must be established with Ingeteam according to the
characteristics of the PV plant.
16.3.2. Connection process
Proceed in the following order for each phase:
1. Clean the contact surfaces on both the terminal and the busbar with a clean cloth and ethanol.
2. Connect the busbars using the bolts, nuts and washers specified by Ingeteam, applying a tightening
torque of 42 Nm with NLGI 1 anti-seize lubrication.
110
AC connection
Ingeteam
Содержание INGECON SUN 1000TL U B360
Страница 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Страница 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Страница 176: ...Notes...
Страница 177: ...Notes...
Страница 178: ...Notes...
Страница 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...