ABK2027IQE01_A - Installation and Operation Manual
The technical requirements of the auxiliary transformer are:
•
The transformer’s power should be suitable for the loads connected to it, taking the site environmental
conditions into account. The minimum power value is 4700 VA per inverter.
•
The power winding must withstand pulsating voltage components with dU/dt of 500 V/uS. Because of
inverter operation, the voltage between a phase and ground can reach 3/2 of the open circuit voltage of
the PV array.
•
Delta connection is advised in the power part and star connection in auxiliary loads.
•
We recommend connecting the neutral of the auxiliary loads to ground.
6.9. Measuring equipment connected to the power grid
All measuring devices connected to the power grid (wattmeters, meters, etc.) should be isolated from the grid by
voltage transformers, current transformers, etc.
56
Preparation for installing the unit
Ingeteam
Содержание INGECON SUN 1000TL U B360
Страница 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Страница 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Страница 176: ...Notes...
Страница 177: ...Notes...
Страница 178: ...Notes...
Страница 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...