ABK2027IQE01_A - Installation and Operation Manual
On the other inverter, remove the end of line resistor from the wiring between -X26.3A y -X26.4A
and connect the other end of the CAN cable with the color code described in the diagram to
-X26.1B, -X26.2B, -X26.3B, -X26.4B.
A
B
C
D
-PV1
-PV2
-INV1
-QDC
-QDC
-FG1
-TSGND
-INV2
+
-
+
-
77
Connection of the PV array grounding kit [optional]
Ingeteam
Содержание INGECON SUN 1000TL U B360
Страница 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Страница 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Страница 176: ...Notes...
Страница 177: ...Notes...
Страница 178: ...Notes...
Страница 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...