ABK2027IQE01_A - Installation and Operation Manual
2. Connect the CAN communication buses from the inverters using the cable provided. To connect the
communication buses, carry out the following process:
CAN
CAN
Inverter 1
Inverter 2
Inverter 3
On the inverter with -TSGND, remove the end of line resistor from the wiring between -X26.3D
and -X26.4D and connect the CAN cable with the color code described in the diagram to -X26.1C,
-X26.2C, -X26.3C, -X26.4C.
On inverter 2, remove the end of line resistor from the wiring between -X26.3A and -X26.4A and
connect the other end of the CAN cable with the color code described in the diagram to -X26.1B,
-X26.2B, -X26.3B, -X26.4B.
On inverter 2, remove the end of line resistor from the wiring between -X26.3D and -X26.4D and
connect another CAN cable with the color code described in the diagram to -X26.1C, -X26.2C,
-X26.3C, -X26.4C.
On inverter 3, connect the other end of the CAN cable with the color code described in the diagram
to -X26.1B, -X26.2B, -X26.3B, -X26.4B and remove the end of line resistor from the wiring between
-X26.3A and -X26.4A.
A
B
C
D
79
Connection of the PV array grounding kit [optional]
Ingeteam
Содержание INGECON SUN 1000TL U B360
Страница 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Страница 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Страница 176: ...Notes...
Страница 177: ...Notes...
Страница 178: ...Notes...
Страница 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...