7 Installation and Initial Operation
Installation and initial operation of the equipment may only be car-
ried out by qualified personnel from the manufacturer or personnel
authorised by the manufacturer.
WARNING
Installation and initial operation requires qualified and experi-
enced personnel. Faulty installation may lead to dangerous situ-
ations or severe loss of property.
Only let carry out installation and initial operation by the manu-
facturer’s qualified personnel or authorised personnel by the
manufacturer only.
Therefore, the following sections only list the energies that must be
provided and the connection requirements that are to be respected
on site by the provider.
Exception
The basic functions of the bioreactor are tested and demonstrated
at the same time to the operator in form of a short test run on site
during installation by the qualified personnel.
In order to become familiar with the basic functions of the bioreac-
tor before the first cultivation or after a longer period of non-use of
the equipment, the operator may afterwards carry out this short
test run any time, too.
For details refer to chapter “Test Run”.
7.1 General Location Requirements for Installation
The following requirements must be met for the installation of the
equipment:
The figures and ranges specified in the chapters “Technical
Data, Connection Values” and “Technical Data, Operating
Conditions” must be observed.
The equipment must only be installed inside a laboratory or a
laboratory-like environment.
The installation site must be level, sufficiently stable and able
to bear loads.
There must not be any sources of electrical interference near
the equipment.