Labfors 5 – Version for Microorganisms
Before Fermentation/Cultivation
Page
148
of
205
22 January 2019
A detailed description on the calibration can be found in the sepa-
rate operating manual of the touch screen software.
8.2.15 Checking the Hoses and Hose Connections
Check and ensure the following items before each cultivation:
Hoses show no kinks and are not able to kink.
Hoses are undamaged and show no weaknesses.
Gas hoses and connections do not show any leaks.
Hose lines are as short as possible.
Hoses are secured with cable ties and/or hose clamps.
Only the pressure hoses supplied by the equipment manufac-
turer are connected as supply lines (water, gas) between the
in-house connections and the equipment.
Содержание Labfors 5
Страница 208: ......