
Chapter 2 • Preparing for installation
1039456-0001 Revision A
15
Additional equipment
•
Antenna
•
Hughes antenna pointing tool (DAPT for Ka-band, DAPT or OPI for Ku-band)
•
IFL cables, cable connectors, and ground blocks
For more information on these items, see
Related components
on page 18.
No tools are required to install the router. For tools needed to install the antenna
mount and antenna and point the antenna, see:
•
Antenna Site Preparation and Mount Installation Guide
(1035678-0001)
•
The installation guide for the antenna model you are installing
Conducting a site survey
Survey the customer site to confirm that the location meets the requirements for
installation of the satellite router. For complete site survey information, including site
requirements, see the
Antenna Site Preparation and Mount Installation Guide
(1035678-0001).
The key site survey tasks related to installation of the satellite router are:
1. Make sure there is an unobstructed line of sight to the satellite specified on the
Installation Reference Sheet.
2. Review the Installation Reference Sheet for site-specific instructions and the
installation specification for customer-specific instructions.
Power supply information
See also
Connecting the power supply
on page 24.
The power supply is included in the satellite router shipping carton.
Figure 3: AC power supply for the HX90 satellite router
DC
power
cord
Power
supply
AC
power
cord
Содержание HX90
Страница 66: ...Chapter 5 Completing the installation 66 1039456 0001 Revision A ...
Страница 88: ...Chapter 7 LEDs 88 1039456 0001 Revision A ...
Страница 110: ...Chapter 8 Troubleshooting 110 1039456 0001 Revision A ...
Страница 112: ...Figure 78 Selection aid for Ku band LNBs Appendix A LNB selection reference 112 1039456 0001 Revision A ...
Страница 114: ...Appendix B Updating the router software 114 1039456 0001 Revision A ...
Страница 118: ...Appendix C Standards compliance 118 1039456 0001 Revision A ...
Страница 124: ... Index 124 1039456 0001 Revision A ...