Hardware Options Installation
5.
Connect the data cable (1) and power cable (2) to the back of the drive.
2
1
Figure 3-16: Connecting the data and power cables to
the tape drive
6.
Connect the data cable into a SCSI controller channel (secondary SCSI channel
shown in Figure 3-16).
HP ProLiant ML350 Generation 3 Server Setup and Installation Guide
3-19
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: d-ch3 Hardware Options Installation.doc
Codename: Steel Venom Part Number: 316354-001 Last Saved On: 12/6/02 3:06 PM