Overview of Server Installation
2.
Position the slide assembly according to the pencil marks made with the template
earlier, extending the slide assembly to fit the rack (1).
3.
Secure the front of the mounting bracket first. Insert the round-hole rack bracket
mounting screws and nuts into position and tighten (2).
Figure 2-14: Securing the round-hole rack bracket slide
assembly
4.
Secure the back of the slide assembly. Insert the round-hole rack bracket
mounting screws and nuts into position and tighten.
IMPORTANT:
Be sure that the mounting bracket is level from front to back.
Repeat this process for the other mounting bracket slide assembly.
Installing the Server into the Rack
To install the server into the rack:
WARNING:
To reduce the risk of personal injury or damage to the
equipment, a minimum of two people MUST lift the server into the rack. If
the unit is loaded above chest level, a third person must assist in aligning
the rails while the other two support the unit.
HP ProLiant ML350 Generation 3 Server Setup and Installation Guide
2-23
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: c-ch2 Overview of Server Installation.doc
Codename: Steel Venom Part Number: 316354-001 Last Saved On: 12/6/02 2:56 PM