en
12.2020 / Rev. 02
AB66005
30 / 174
Commissioning
2
1
1
Fig. 23: Pulling incubator forward
1 Metal rails
2 Metal rods
4.
Hold the two metal bars and carefully pull the incubator off the
wooden pallet using the metal rails.
NOTICE
Do not lift the incubator with the metal bars, as
otherwise the rear panel may be damaged.
5.
Unscrew the metal bars from the rear panel of the incubator.
6.
Successively lift the incubator on the left and right sides slightly
and remove the two metal rails.
5.2
Setting up, connecting and switching on the incubator
5.2.1
Installing the incubator
Upon consultation, the service technician can mount
the door hinges on the other side on site.
NOTICE
If there is a cold-to-warm temperature difference,
there is a danger that condensate will form on the
electrical components of the incubator.
The forming condensate can cause a short circuit.
Allow the incubator to acclimate for at least three
hours at the installation site before putting the device
into operation.
■
Please check the device for perfect mechanical condition and
check the completeness of the delivered articles against your
order.
■
When choosing the installation site, take the weight of the device
and its load into account. See
■
The installation site must not be directly exposed to sunlight or be
located near heat sources.
■
Ventilation openings may not be blocked. A distance of 100 mm
must be maintained from the ventilation slots and openings of the
incubator.
Содержание HettCube 200
Страница 151: ...151 174 en 12 2020 Rev 02 AB66005 Index W Warning symbols 7 Warnings and error messages 126 ...
Страница 152: ...en 12 2020 Rev 02 AB66005 152 174 Index ...
Страница 153: ...13 Appendix ...
Страница 154: ......
Страница 166: ...en 12 2020 Rev 02 AB66005 166 174 Examples ...
Страница 170: ...en 12 2020 Rev 02 AB66005 170 174 Accessory overview ...
Страница 171: ...171 174 en 12 2020 Rev 02 AB66005 Declaration of conformity D Declaration of conformity ...