6. User Acceptance Tests
Initials: _____
Technical Manual P/N 9894.00.G6
6-3
6.2
ACCURACY OF LOADING FACTORS
Test Equipment
Use the following calibrated measurement devices:
•
Non-invasive or invasive kV meters
•
mA/mAs meter
•
X-ray Dose Meter
6.2.1
kV Accuracy
Acceptance Test Logbook
(2/11)
1.
Perform the following 3-point exposures (3) using the loading factors of
Table 55 and verify the accuracy of the tube kV (intermittent mode). The
error of the measured X-ray Tube Voltage of the different loading factors
combination shall not be
greater than
± (5% + 2 kV)
.
Table 55
Passed
Failed
2.
Do Fluoro using the loading factors of Table 56 and verify the accuracy of
the tube kV in continuous mode. The error of the measured X-ray Tube
Voltage of the different loading factors combination shall not be
greater
than
± (5% + 2 kV)
.
Table 56
Passed
Failed
Table 55-
Tube kV Accuracy (Intermittent mode)
Requested Conditions
Exposure 1
Lowest kV
Compliance Criteria
Highest
available mA
Shortest
Time
40 kV
40 kV
± (5% + 2 kV)
____ mA
1.0 ms
Select
Measure
____ kV
Test Passed
Test Failed
Requested Conditions
Exposure 2
Lowest kV
Compliance Criteria
Highest
available mA
Time
(
≅
100 ms)
40 kV
40 kV
± (5% + 2 kV)
____ mA
100 ms
Select
Measure
____ kV
Test Passed
Test Failed
Requested Conditions
Exposure 3
Highest kV
Compliance Criteria
Highest
available mA
Time
(
≅
100 ms)
____ kV
___ kV
± (5% + 2 kV)
____ mA
100 ms
Select
Measure
____ kV
Test Passed
Test Failed
Содержание EMD Epsilon EPS 45-80
Страница 1: ...EPS 45 80 High Voltage Generator Technical Manual MANUAL P N 9894 00 G6...
Страница 81: ...3 Interfacing Technical Manual P N 9894 00 G6 3 23 Figure 3 6 2 2 Interlock X RAY shown in a RAD Fluoro...
Страница 142: ...EPS 45 80 High Voltage Generator 4 44 Technical Manual P N 9894 00 G6 THIS PAGE LEFT BLANK...
Страница 244: ...EPS 45 80 High Voltage Generator 7 64 Technical Manual P N 9894 00 G6 THIS PAGE LEFT BLANK...