59
GBF
−
35 / GBF
−
50 Fryers
Fryer Operation
For multi
‐
well system, this instruction
refers to the unit with the filter pan:
5. Connect the provided
Waste Oil
Discharge Hose
⑦
to the
DISCHARGE
HOSE COUPLING
⑧
(push in on the
slip
‐
ring while inserting brass hose
fitting)
. Ensure that connection is
secure.
6. Place the
wand end
of hose into an
appropriate waste oil disposal container
⑨
(Giles Oil Caddy is depicted, not
provided)
.
7. Set the
DISCHARGE HOSE
valve
⑩
to
the
[DISCHARGE HOSE]
position
(vertical).
Wear thermal protection (gloves or oven mitts) when
holding & handling the
discharge hose
. Some parts of
it can become very hot
!
4.05 Removing Waste Cooking Oil from Fryer
−
continued
7
9
10
8
11
8. Set the
PUMP
switch
⑪
to the
[PUMP]
position. Waste cooking oil will be delivered through the connected
hose into the disposal container. When filter pan has emptied, return
PUMP
&
POWER
switches to
[OFF]
position.
IMPORTANT! DO NOT start pump unless hose is properly connected, pump damage can occur.
9. Return the
DISCHARGE HOSE
valve handle
⑩
to the
[CLOSE]
position.
10. Remove the discharge hose from the coupling
(push in on the slip
‐
ring while pulling hose fitting out of coupling)
.
Drain waste oil remaining in the hose into the waste container.
Continued on Next Page
B. Removing Waste Oil from Fryer Using a Bulk Waste Oil Disposal System:
The following explains the procedure for removing & disposing of waste oil using a connected,
customer
‐
provided
,
waste oil collection/disposal system. The fryer must be equipped with the
optional, factory
‐
installed plumbing,
that provides for a direct connection to a bulk system.
Before first use, confirm that equipment is properly connected in accordance with the manufacturer’s instructions
& guidelines, and that the bulk system is operating correctly.
Содержание GBF-35
Страница 10: ...4 ...
Страница 22: ...16 Overview GBF 35 GBF 50 Fryers 3 01 Baskets Optional Auto Basket Lifts 2 Hidden 1 4 3 ...
Страница 34: ...28 Overview GBF 35 GBF 50 Fryers Notes ...
Страница 68: ...62 Fryer Operation GBF 35 GBF 50 Fryers ...
Страница 78: ...72 Troubleshooting GBF 50 Fryer ...
Страница 86: ...80 Parts List GBF 35 GBF 50 Fryers 7 05 Control Box Front behind Control Panel 2 5 1 6 4 3 7 8 10 11 ...
Страница 98: ...92 Parts List GBF 35 GBF 50 Fryers 7 11 Fry Vat Assembly 2 3 Top View 1 4 5 Bottom View 7 8 9 10 10 11 12 13 6 ...
Страница 100: ...94 Parts List GBF 35 GBF 50 Fryers 7 12 Filter Pan 3 1 5 4 2 9 7 10 6 8 A ...
Страница 102: ...96 Parts List GBF 35 GBF 50 Fryers Notes ...
Страница 103: ......