2.06 Ventilation
Consult a professional ventilation contractor or HVAC company to determine if an existing system is sufficient to
provide proper ventilation for this equipment, or to design and specify a ventilation hood system that will be
compliant with code requirements.
2.05.1
Electrical Connections Diagram
Flexible Conduit
Service Box
Connect flex conduit from
incoming supply power
here.
Ground Lug
Distribution Block:
connect supply power
to this side.
GBF
−
35 / GBF
−
50 Fryers
Installation
8
Main Breaker
Box
Disconnect Switch
Box
(Recommended)
NOTE:
Guidelines and codes for ventilation system requirements differ from locale to locale. Always consult the local
Code Authorities (AHJ)
to ensure proper compliance.
Содержание GBF-35
Страница 10: ...4 ...
Страница 22: ...16 Overview GBF 35 GBF 50 Fryers 3 01 Baskets Optional Auto Basket Lifts 2 Hidden 1 4 3 ...
Страница 34: ...28 Overview GBF 35 GBF 50 Fryers Notes ...
Страница 68: ...62 Fryer Operation GBF 35 GBF 50 Fryers ...
Страница 78: ...72 Troubleshooting GBF 50 Fryer ...
Страница 86: ...80 Parts List GBF 35 GBF 50 Fryers 7 05 Control Box Front behind Control Panel 2 5 1 6 4 3 7 8 10 11 ...
Страница 98: ...92 Parts List GBF 35 GBF 50 Fryers 7 11 Fry Vat Assembly 2 3 Top View 1 4 5 Bottom View 7 8 9 10 10 11 12 13 6 ...
Страница 100: ...94 Parts List GBF 35 GBF 50 Fryers 7 12 Filter Pan 3 1 5 4 2 9 7 10 6 8 A ...
Страница 102: ...96 Parts List GBF 35 GBF 50 Fryers Notes ...
Страница 103: ......