Rack and pinion hoist
Assembly and Operating Manual
47 / 92
BL054 GB Edition 08.2015
6.3
Extending mast sections and anchoring to the building
If the equipment is erected in front of scaffolding it must be anchored to
the building.
It can also be anchored directly to the scaffolding if the scaffolding
has been designed for the additional load (see anchoring forces).
Equipment is assembled from the platform and from the scaffolding.
Set the first anchor at a height of approximately 3m (where the
scaffolding is below the decking).
If it is not possible to place an anchor at a height of 2-3 m, secure
the foot section against shifting (e.g. with pegs or dowels).
The assembly engineers ascend in the platform. Operation may
only be carried out using the assembly control.
To start with, the platform is on the ground:
•
Unlock the ramp at the interlock hook (1)
and lower it.
The open ramp interrupts the safety circuit.
The platform cannot be moved while the
ramp is open.
•
Load the platform with mast sections, parts for mast ties and tools
(load capacity max. 250 kg)
.
•
Close the ramp from inside and make sure that the interlock hook (1)
is latched completely into place.
•
For assembly of the hoist, turn the key (2) in
the switch on the assembly control to the
right to “Assembly” (position
vertical
).
1
2
Содержание 14830
Страница 1: ...Original assembly and operating manual Assembly and Operating Manual Rack and pinion hoist For loads...
Страница 2: ......
Страница 3: ...Rack and pinion hoist Assembly and Operating Manual 3 92 BL054 GB Edition 08 2015...
Страница 4: ...Rack and pinion hoist Assembly and Operating Manual 4 92 BL054 GB Edition 08 2015...
Страница 36: ...Rack and pinion hoist Assembly and Operating Manual 36 92 BL054 GB Edition 08 2015...
Страница 90: ...Rack and pinion hoist Assembly and Operating Manual 90 92 BL054 GB Edition 08 2015...
Страница 91: ......