Rack and pinion hoist
Assembly and Operating Manual
44 / 92
BL054 GB Edition 08.2015
5
Transport
Have the hoist transported by experienced and competent
persons.
Inspection on receiving the hoist
•
Check the shipment for transport damage and for completeness
according to the purchase order.
•
Immediately notify the freight carrier (haulage company) and dealer
of any transport damage.
Loading and unloading the machine
The machine components are loaded and unloaded using a crane.
•
Thread the round sling through
the crane lug (1) on the trolley.
•
Hang the crane hook on the
round sling.
Weight of the base unit with
cable bin approx. 615 kg
Do not secure round sling directly to the mast.
Transportation and loading using a trailer is described in the
Operating Manual for the trailer.
1
Содержание 14830
Страница 1: ...Original assembly and operating manual Assembly and Operating Manual Rack and pinion hoist For loads...
Страница 2: ......
Страница 3: ...Rack and pinion hoist Assembly and Operating Manual 3 92 BL054 GB Edition 08 2015...
Страница 4: ...Rack and pinion hoist Assembly and Operating Manual 4 92 BL054 GB Edition 08 2015...
Страница 36: ...Rack and pinion hoist Assembly and Operating Manual 36 92 BL054 GB Edition 08 2015...
Страница 90: ...Rack and pinion hoist Assembly and Operating Manual 90 92 BL054 GB Edition 08 2015...
Страница 91: ......