5-100
W650 Wind Generator Protection System
GEK-113032A
5.6 INPUTS/OUTPUTS
5 SETTINGS
5
Table 5–82: SUPERVISION WITH 52/A
There is a possibility to monitor the trip circuit and trip coil continuity. This can be done by monitoring Vdc through the
output contact when this is open.
Table 5–83: SUPERVISION ALGORITHM WITH SIMPLE VOLTAGE SUPERVISION SCHEME
In this table, ON means that the voltage detector V52/a is active, detecting a voltage.
In the first case shown on the table, with closed breaker, voltage is detected by V 52/a sensor, and this means that there is
continuity in the supervised circuit.
As shown on Figure 5–28:, when the relay is not tripped, trip contact F35-F36 remains open. If the breaker is closed, its
auxiliary contact 52a is closed. Therefore, a little current is flowing, about 2 mA, through terminals F15 and F16 through the
voltage detector circuit, which flows through 52/a and the tripping coil 52TC (TC = tripping coil). Current will only circulate
when there is continuity in the whole circuit, so the complete circuit is monitored, and not only the trip coil. This circuit
includes auxiliary 52/a as well as the whole wiring between the battery and the relay tripping terminals, and between these
and the breaker tripping circuit.
For the second case shown on the table, open breaker, its auxiliary contact 52/a remains open, and current
cannot flow through it for detecting continuity. In order to correctly monitor the circuit, a resistor must be used,
not included in the protection, connected in parallel. The value of resistance will be selected so that the V 52/a
input circuit minimum detection current flows, but not as high as to activate the breaker-tripping coil. The figure
shows the following equation:
Where:
Vmin
Is the minimum voltage, in Volts, expected in the battery (e.g. 80% of Vn)
R
Resistance, in kilo ohms.
2
2 mA of approximate current flowing through input V 52/a
As shown in the second case in the table, with an open breaker, as current will flow through R if there is continuity in the
WHOLE tripping circuit, voltage will be detected in input V 52/a.
INTERNAL STATE
V 52/A
SUPERVISION
52 open
ON
Ok
52 closed
ON
Ok
TRIP
OFF
Ok if t < 0.5 s
TRIP with 52 open
OFF
Ok if t < 0.5 s
STATUS OF INVOLVED ELEMENTS
INPUT TO 650
DECISION
CIRCUIT
STATUS
OUTPUT
STATUS
(F35-F36)
BREAKER
STATUS
OPERAND
CONT IP_X_CC11
(VA_COIL2)
V 52/A (F15-F16)
OPERAND
CONT IP_X_CC16
(SUP_COIL2)
Healthy
Open
52 closed
ON
ON
Healthy
Open
52 open
ON
ON
Healthy
Closed
52 closed
OFF
ON (if t < 500 ms)
OFF (if t > 500 ms)
Healthy
Closed
52 open
OFF
ON (if t < 500 ms)
OFF (if t > 500 ms)
Faulty
Open
52 closed
OFF
OFF (500 ms delay)
Faulty
Open
52 open
OFF
OFF (500 ms delay)
Faulty
Closed
52 closed
OFF
OFF (500 ms delay)
Faulty
Closed
52 open
OFF
OFF (500 ms delay)
Содержание Multilin W650
Страница 2: ......
Страница 10: ...VIII W650 Wind Generator Protection System GEK 113032A TABLE OF CONTENTS ...
Страница 30: ...1 20 W650 Wind Generator Protection System GEK 113032A 1 4 W650 HARDWARE 1 GETTING STARTED 1 ...
Страница 140: ...4 72 W650 Wind Generator Protection System GEK 113032A 4 3 WEB SERVER 4 HUMAN INTERFACES 4 ...
Страница 360: ...7 48 W650 Wind Generator Protection System GEK 113032A 7 2 IEC 61850 PROFILE FOR W650 7 IEC 61850 PROTOCOL 7 ...
Страница 368: ...8 8 W650 Wind Generator Protection System GEK 113032A 8 4 OBJECT DICTIONARY 8 W650 CANOPEN PROFILE 8 ...
Страница 406: ...11 22 W650 Wind Generator Protection System GEK 113032A 11 15 RECLOSER 79 11 COMMISSIONING 11 ...
Страница 422: ...13 6 W650 Wind Generator Protection System GEK 113032A 13 4 RELAY CONFIGURATION 13 FREQUENTLY ASKED QUESTIONS 13 ...
Страница 446: ...A 22 W650 Wind Generator Protection System GEK 113032A A 1 LOGIC OPERANDS APPENDIXA A ...
Страница 596: ...D 8 W650 Wind Generator Protection System GEK 113032A D 5 IEC 60870 5 104 POINT LIST APPENDIXD D ...
Страница 622: ...F 2 W650 Wind Generator Protection System GEK 113032A F 1 GE MULTILIN WARRANTY APPENDIXF F ...