GE H
EALTHCARE
PROPRIETARY TO GE
D
IRECTION
5394227, 12
LOGIQ S8/LOGIQ E8 S
ERVICE
M
ANUAL
Section 3-9 - Optional Peripherals/Peripheral Connection
3 - 47
3-9-4
ECG connector
Connect the ECG cable to the ECG connector on the monitor arm or on the side of the operator panel,
depending on the system version.
Figure 3-34 ECG Connector location (R1 to R3 system)
Figure 3-35 ECG Connector location (R4 system)
Figure 3-36
Содержание LOGIQ S8
Страница 11: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL ix ZH CN KO...
Страница 12: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL x...
Страница 16: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL xiv This page was intentionally left blank...
Страница 32: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 16...
Страница 176: ...GE HEALTHCARE PROPRIETARY TO GE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 3 98 Section 3 16 Paperwork...
Страница 416: ...GE HEALTHCARE DIRECTION 5394227 REVISION 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL Index 4...
Страница 417: ......